СОГЛАШЕНИЕ МЕЖДУ ПРАВИТЕЛЬСТВОМ РОССИЙСКОЙ ФЕДЕРАЦИИ И МЕЖДУНАРОДНЫМ БАНКОМ РЕКОНСТРУКЦИИ И РАЗВИТИЯ О ГРАНТЕ N TF028315 ДЛЯ ФИНАНСИРОВАНИЯ ПРОЕКТА ГЛОБАЛЬНОГО ЭКОЛОГИЧЕСКОГО ФОНДА ПО СОХРАНЕНИЮ БИОРАЗНООБРАЗИЯ РОССИЙСКОЙ ФЕДЕРАЦИИ (GEF TRUST FUND TF028315) [АНГЛ.] (ЗАКЛЮЧЕНО В Г. ВАШИНГТОНЕ 29.09.1996)

Текст документа с изменениями и дополнениями по состоянию на ноябрь 2007 года

Обновление

Правовой навигатор на www.LawRussia.ru

<<<< >>>>


                                               GEF TRUST FUND TF028315
   
        GLOBAL ENVIRONMENT FACILITY TRUST FUND GRANT AGREEMENT
                                   
                       (Washington, 29.IX.1996)
   
       Agreement, dated September 29, 1996, between Russian Federation
   (the  Recipient)  and  International Bank  for  Reconstruction  and
   Development  (the Bank), acting as an implementing  agency  of  the
   Global  Environment  Facility  (GEF)  in  respect  of  grant  funds
   provided  to the Global Environment Facility Trust Fund (GET  Trust
   Fund) by certain members of the Bank, as participants of the GEF.
       Whereas: (A) the Bank, pursuant to Resolution No. 91-5 of March
   14,  1991, of the Executive Directors of the Bank, established  the
   GEF  to  assist  in  the protection of the global  environment  and
   promote  thereby  environmentally sound  and  sustainable  economic
   development;
       (B)  following the restructuring of the GEF, such  arrangements
   are continued in place on the basis set forth in Resolution No. 94-
   2  (Resolution No. 94-2) of the Executive Directors  of  the  Bank,
   dated May 24, 1995, establishing the GEF Trust Fund;
       (C)   the  Recipient,  having  satisfied  itself  as   to   the
   feasibility and priority of the Project described in Schedule 2  to
   this Agreement, has requested assistance from the resources of  the
   GET  Trust Fund in the financing of the Project, and the  Bank  has
   determined  that  such  assistance  would  be  in  accordance  with
   Resolution No. 94-2;
       (D)  the  Recipient has also requested the Bank to finance  the
   Environmental  Management Project (EMP) with which the  Project  is
   associated,  and, by an agreement dated February  6,  1995  between
   the  Recipient and the Bank (EMP Loan Agreement), as  amended,  the
   Bank  has  agreed to finance the EMP through a loan in an aggregate
   principal  amount  equivalent to one hundred  ten  million  Dollars
   (110,000,000 USD) (EMP Loan);
       (E)  the  Recipient intends to benefit from a Swiss  government
   grant  (Swiss Grant) in an amount equivalent to 1,100,000  USD,  to
   assist  in the financing of the Project on the terms and conditions
   to  be  set forth in an exchange of letters (Swiss Grant Agreement)
   between the Recipient and the Swiss government; and
       Whereas the Bank has agreed, on the basis, inter alia,  of  the
   foregoing,  to extend the GEF Trust Fund grant (the Grant)  to  the
   Recipient  upon  the  terms  and  conditions  set  forth  in   this
   Agreement;
       Now therefore the parties hereto hereby agree as follows:
   
                               Article I
                                   
                    General Conditions; Definitions
   
       Section  1.01.  (a)  The following provisions  of  the  General
   Conditions  Applicable  to  Loan and Guarantee  Agreements  of  the
   Bank,  dated January 1, 1985, with the modifications set  forth  in
   paragraph  (b) of this Section (the General Conditions)  constitute
   an integral part of this Agreement:
       (i) Article I;
       (ii)  Sections  2.01 (1), (2), (3), (4), (6), (8),  (9),  (10),
   (11), (15), (18) and (20), 2.02 and 2.03;
       (iii) Section 3.01;
       (iv) Section 4.01 and the first sentence of Section 4.09;
       (v) Article V;
       (vi)  Sections 6.01, 6.02 (a), (c), (d), (e), (f), (i) and (k),
   6.03, 6.04 and 6.06;
       (vii) Section 8.01 (b);
       (viii) Sections 9.01 (a) and (c), 9.04, 9.05, 9.06, 9.07,  9.08
   and 9.09;
       (ix) Sections 10.01, 10.03 and 10.04;
       (x) Article XI; and
       (xi) Section 12.04.
       (b) The General Conditions shall be modified as follows:
       (i)  a new paragraph shall be added to the end of Section  2.01
   to  read  as follows: "21. 'Special Drawing Rights' and 'SDR'  mean
   special  drawing  rights  as valued by the  International  Monetary
   Fund in accordance with its Articles of Agreement";
       (ii)  the term "Bank", wherever used in the General Conditions,
   other  than in Sections 2.01 (8) and 6.02 (f) thereof and the  last
   use  of  such term in Section 5.01 thereof, means the Bank,  acting
   as  an implementing agency of the GEF, except that in Section 6.02,
   the  term  "Bank"  shall  also include the International  Bank  for
   Reconstruction and Development acting in its own capacity;
       (iii)  the  term  "Borrower",  wherever  used  in  the  General
   Conditions, means the Recipient;
       (iv)  the  term "Loan Agreement", wherever used in the  General
   Conditions, means this Agreement;
       (v)  the  term "Loan" and "loan" wherever used in  the  General
   Conditions, means the Grant;
       (vi)  the  term  "Loan Account" wherever used  in  the  General
   Conditions, means the Grant Account;
       (vii) the second sentence of Section 5.01 is modified to read:
       "Except as the Bank and the Recipient shall otherwise agree, no
   withdrawals  shall be made: (a) on account of expenditures  in  the
   territories  of any country which is not a member of  the  Bank  or
   for   goods   procured   in,  or  services  supplied   from,   such
   territories;  or (b) for the purpose of any payment to  persons  or
   entities, or for any import of goods, if such payment or import  to
   the  knowledge  of  the Bank is prohibited by  a  decision  of  the
   United  Nations Security Council, taken under Chapter  VII  of  the
   Charter of the United Nations"; and
       (viii) a new sub-paragraph is added after sub-paragraph (k)  in
   Section  6.02  of  the  General Conditions,  as  follows:  "(1)  An
   extraordinary  situation shall have arisen  in  which  any  further
   disbursement  under the Grant would exceed the resources  available
   for disbursement from the GEF Trust Fund."
       Section  1.02.  Wherever  used in this  Agreement,  unless  the
   context  otherwise  requires,  the several  terms  defined  in  the
   General  Conditions and in the Recitals to this Agreement have  the
   respective  meanings therein set forth and the following additional
   terms have the following meanings:
       (a)   "Commission  for  Lake  Baikal"  means  the   Recipient's
   Governmental  Commission for Lake Baikal, established  pursuant  to
   Government  of Russia Resolution No. 653 entitled "On  Organization
   of  Activity  of  Governmental Commission for Lake  Baikal",  dated
   July 12, 1993, or any successor thereto;
       (b)  "Component  Director"  means  a  senior  official  of  the
   Recipient  appointed by the SCEP to supervise  the  management  and
   implementation of a Project part, and referred to in  Part  A.4  of
   Schedule 4 to this Agreement;
       (c)  "Component Manager" means a person responsible for day-to-
   day  management of a Project part, and referred to in Part  A.5  of
   Schedule 4 to this Agreement;
       (d) "CPPI" means the Recipient's Center for Project Preparation
   and  Implementation, a non-commercial organization founded  by  the
   Ministry   of   Environmental  Protection  and  Natural   Resources
   pursuant  to  Order  No.  247, dated December  2,  1993,  and  duly
   registered  on  December 30, 1993, by the Division on  Registration
   of  Noncommercial Organizations, Department of Social and Political
   Relations,  Municipal  Government  of  Moscow,  or  any   successor
   thereto;
       (e) "EMP Loan Agreement" means the agreement dated February  6,
   1995  between the Recipient and the Bank, as such agreement may  be
   amended  from  time  to time; and such term includes  the  "General
   Conditions  Applicable  to Loan and Guarantee  Agreements"  of  the
   Bank, dated January 1, 1985, as applied to such agreement, and  all
   schedules  and  agreements supplemental to the EMP Loan  Agreement;
   and  the term "EMP Loan" means the loan provided under the EMP Loan
   Agreement;
       (f)  "General Consultant" means the general consultant referred
   to in Part A.3 of Schedule 4 to this Agreement;
       (g) "FFS" means the Federal Forest Service of the Recipient, or
   any successor thereto;
       (h)   "Inter-regional  Subcomponent  Manager"  means  a  person
   selected  to  perform  the  day-to-day  implementation  of   inter-
   regional  activities under Part C of the Project, and  referred  to
   in Part B.4 of Schedule 4 to this Agreement;
       (i)  "Lake  Baikal  Supervisory Committee"  means  a  committee
   responsible for the overall implementation and management  of  Part
   C  of  the  Project, and referred to in Part B.3 of Schedule  4  to
   this Agreement;
       (j)  "Project  Director" means a senior official  of  the  SCEP
   appointed  to  chair the Supervisory Committee and referred  to  in
   Part A.1 of Schedule 4 to this Agreement;
       (k) "Project Implementation Group" means an administrative unit
   within  the  CPPI, referred to in Part C.2 of Schedule  4  to  this
   Agreement;
       (l) "Project Manager" means a person responsible for day-to-day
   management of the Project, and referred to in Part A.2 of  Schedule
   4 to this Agreement;
       (m)  "Regional Subcomponent Director" means an official of  the
   administration  of the Irkutsk Oblast, government of  the  Republic
   of  Buryatia,  and administration of the Chita Oblast appointed  by
   the  SCEP  in  coordination  with  such  regional  authorities   to
   supervise  regional  and  local activities  under  Part  C  of  the
   Project,  and  referred  to  in Part B.4  of  Schedule  4  to  this
   Agreement;
       (n) "Regional Subcomponent Manager" means a person selected  to
   perform  the  day-to-day  implementation  of  regional  and   local
   activities  under Part C of the Project, and referred  to  in  Part
   B.3 of Schedule 4 to this Agreement;
       (o)   "SCEP"   means  the  Recipient's  State   Committee   for
   Environmental Protection, or any successor thereto;
       (p)  "Special Account" means the account referred to in Section
   2.02 (b) of this Agreement; and
       (q)  "Supervisory Committee" means a committee responsible  for
   the  overall  coordination and monitoring of the Project,  referred
   to in Part A.1 of Schedule 4 to this Agreement.
   
                              Article II
                                   
                               The Grant
   
       Section  2.01.  The  Bank  agrees  to  make  available  to  the
   Recipient, on the terms and conditions set forth or referred to  in
   this  Agreement,  the  Grant  in an amount  in  various  currencies
   equivalent  to  thirteen  million eight  hundred  thousand  Special
   Drawing Rights (SDR 13,800,000).
       Section 2.02. (a) The amount of the Grant may be withdrawn from
   the  Grant Account in accordance with the provisions of Schedule  1
   to  this Agreement for expenditures made (or, if the Bank shall  so
   agree,  to be made) in respect of the reasonable cost of goods  and
   services  required for carrying out the Project and to be  financed
   out of the proceeds of the Grant.
       (b)  The  Recipient may, for the purposes of the Project,  open
   and  maintain in Dollars a special deposit account in a  commercial
   bank  on  terms and conditions satisfactory to the Bank,  including
   appropriate  protection  against set off,  seizure  or  attachment.
   Deposits  into, and payments out of, the Special Account  shall  be
   made  in  accordance  with the provisions of  Schedule  5  to  this
   Agreement.
       Section 2.03. The Closing Date shall be June 30, 2002, or  such
   later  date  as  the Bank shall establish. The Bank shall  promptly
   notify the Recipient of such later date.
   
                              Article III
                                   
                       Execution of the Project
   
       Section 3.01. (a) The Recipient declares its commitment to  the
   objectives  of  the  Project as set forth in  Schedule  2  to  this
   Agreement  and, to this end, shall carry out the Project  with  due
   diligence   and  efficiency  and  in  conformity  with  appropriate
   administrative,  financial and technical practices,  and  with  due
   regard  to ecological and environmental factors, and shall provide,
   promptly  as  needed,  the funds, facilities,  services  and  other
   resources required for the Project.
       (b) Without limitation upon the provisions of paragraph (a)  of
   this  Section  and  except  as the Recipient  and  the  Bank  shall
   otherwise  agree,  the Recipient shall carry  out  the  Project  in
   accordance with the Implementation Program set forth in Schedule  4
   to this Agreement.
       Section  3.02.  Except  as  the  Bank  shall  otherwise  agree,
   procurement  of  the goods and consultants' services  required  for
   the  Project  and to be financed out of the proceeds of  the  Grant
   shall  be  governed  by  the  provisions  of  Schedule  3  to  this
   Agreement.
       Section 3.03. Without limitation upon the applicable provisions
   of Section 9.07 of the General Conditions, the Recipient shall:
       (a) prepare, on the basis of guidelines acceptable to the Bank,
   and  furnish  to the Bank not later than six (6) months  after  the
   Closing  Date or such later date as may be agreed for this  purpose
   between  the  Recipient  and  the  Bank,  a  plan  for  the  future
   sustainability of the Project's objectives;
       (b)  afford the Bank a reasonable opportunity to exchange views
   with the Recipient on said plan; and
       (c)  thereafter,  carry out said plan with  due  diligence  and
   efficiency  and  in  accordance with appropriate practices,  taking
   into account the Bank's comments thereon.
   
                              Article IV
                                   
                          Financial Covenants
   
       Section 4.01. (a) The Recipient shall maintain or cause  to  be
   maintained  records and accounts adequate to reflect in  accordance
   with  sound  accounting  practices the  operations,  resources  and
   expenditures  in  respect  of the Project  of  the  departments  or
   agencies of the Recipient responsible for carrying out the  Project
   or any part thereof.
       (b) The Recipient shall:
       (i)  have the records and accounts referred to in paragraph (a)
   of  this Section, including those for the Special Account, for each
   fiscal  year  audited,  in  accordance  with  appropriate  auditing
   principles   consistently   applied,   by   independent    auditors
   acceptable to the Bank;
       (ii)  furnish to the Bank as soon as available, but in any case
   not  later than six (6) months after the end of each such year, the
   report  of such audit by said auditors, of such scope and  in  such
   detail as the Bank shall have reasonably requested; and
       (iii)  furnish  to  the Bank such other information  concerning
   said  records and accounts and the audit thereof as the Bank  shall
   from time to time reasonably request.
       (c) For all expenditures with respect to which withdrawals from
   the  Grant  Account  were  made  on  the  basis  of  statements  of
   expenditure, the Recipient shall:
       (i)  maintain  or  cause to be maintained, in  accordance  with
   paragraph  (a)  of  this Section, records and  accounts  reflecting
   such expenditures;
       (ii)  retain,  until  at  least one year  after  the  Bank  has
   received  the  audit report for the fiscal year in which  the  last
   withdrawal   from   the  Grant  Account  was  made,   all   records
   (contracts, orders, invoices, bills, receipts and other  documents)
   evidencing such expenditures;
       (iii)  enable  the  Bank's  representatives  to  examine   such
   records; and
       (iv) ensure that such records and accounts are included in  the
   annual audit referred to in paragraph (b) of this Section and  that
   the  report  of  such  audit contains a separate  opinion  by  said
   auditors  as  to  whether the statements of  expenditure  submitted
   during  such fiscal year, together with the procedures and internal
   controls  involved  in their preparation, can  be  relied  upon  to
   support the related withdrawals.
   
                               Article V
                                   
                         Remedies of the Bank
   
       Section  5.01.  Pursuant to Section 6.02  (k)  of  the  General
   Conditions, the following additional events are specified:
       (a)  The  exchange of letters related to the  Swiss  Grant  and
   referred to in Whereas Clause (E) of this Agreement shall not  have
   occurred  by  June 30, 1996, or such later date  as  the  Bank  may
   agree   upon;  provided  however,  that  the  provisions  of   this
   paragraph  shall  not  apply if the Recipient  establishes  to  the
   satisfaction  of the Bank that adequate funds for the  Project  are
   available  to  the  Recipient  from  other  sources  on  terms  and
   conditions  consistent with the obligations of the Recipient  under
   this Agreement.
       (b) (i) Subject to subparagraph (ii) of this paragraph:
       (A)  the right of the Recipient to withdraw the proceeds of the
   EMP  Loan  shall  have been suspended, canceled  or  terminated  in
   whole  or in part, pursuant to the terms of the EMP Loan Agreement,
   or
       (B) the EMP Loan shall have become due and payable prior to the
   agreed maturity thereof.
       (ii) Subparagraph (i) of this paragraph shall not apply if  the
   Recipient  establishes to the satisfaction of the  Bank  that:  (A)
   such  suspension, cancellation, termination or prematuring  is  not
   caused  by  the  failure of the Recipient to  perform  any  of  its
   obligations  under such agreement; and (B) adequate funds  for  the
   Project are available to the Recipient from other sources on  terms
   and  conditions  consistent with the obligations of  the  Recipient
   under this Agreement.
   
                              Article VI
                                   
                      Effectiveness; Termination
   
       Section  6.01. The following events are specified as  condition
   to the effectiveness of this Agreement:
       (a)  the Project Implementation Group has been established with
   functions, procedures, and staffing satisfactory to the Bank; and
       (b)  the  General Consultant has been hired by the  CPPI  under
   terms  of  reference and in accordance with procedures satisfactory
   to the Bank.
       Section 6.02. The date ninety (90) days after the date of  this
   Agreement is hereby specified for the purposes of Section 12.04  of
   the General Conditions.
       Section 6.03. This Agreement shall continue in effect until the
   Grant  has  been fully disbursed and the parties to this  Agreement
   have fulfilled all their obligations hereunder.
   
                              Article VII
                                   
              Representative of the Recipient; Addresses
   
       Section   7.01.  The  Chairman  of  the  State  Committee   for
   Environmental  Protection is designated as  representative  of  the
   Recipient  for  the  purposes  of  Section  11.03  of  the  General
   Conditions.
       Section  7.02.  The following addresses are specified  for  the
   purposes of Section 11.01 of the General Conditions:
   
       For the Recipient:
       State Committee for Environmental Protection
       B. Gruzinskaya Street, 4/6
       Moscow, 123812
       Russian Federation
                                                        Telex:
                                                        411 692 BOREI
   
       For the Bank:
       International Bank for
       Reconstruction and Development
       1818 H Street, N.W.
       Washington, D.C. 20433
       United States of America
   
       Cable address:                                   Telex:
   
       INTBAFRAD                                        248423 (MCI)
       Washington, D.C.                                  64145 (MCI)
   
       In  witness  whereof, the parties hereto, acting through  their
   duly  authorized representatives, have caused this Agreement to  be
   signed  in  their  respective names in the  District  of  Columbia,
   United  States  of  America, as of the day  and  year  first  above
   written.
   
                                                    Russian Federation
                                          By Authorized Representative
                                                                      
                                                International Bank for
                                 Reconstruction and Development Acting
                                  as Implementing Agency of the Global
                                                  Environment Facility
                                          By Authorized Representative
   
   
   
   
   
                              SCHEDULE 1
   
                WITHDRAWAL OF THE PROCEEDS OF THE GRANT
   
       1.  The  table below sets forth the Categories of items  to  be
   financed  out of the proceeds of the Grant, the allocation  of  the
   amounts  of  the  Grant  to each Category  and  the  percentage  of
   expenditures for items so to be financed in each Category:
   
   ----------------------------T-----------------T------------------¬
   ¦    Category               ¦ Amount of the   ¦     %  of        ¦
   ¦                           ¦ Grant Allocated ¦   Expenditures   ¦
   ¦                           ¦ (Expressed in   ¦   to be Financed ¦
   ¦                           ¦ SDR Equivalent) ¦                  ¦
   +---------------------------+-----------------+------------------+
   ¦(1) Goods:                 ¦                 ¦100% of foreign   ¦
   ¦                           ¦                 ¦expenditures,     ¦
   ¦   (a) for Part A          ¦    220,000      ¦100% of local     ¦
   ¦       of the Project      ¦                 ¦expenditures      ¦
   ¦                           ¦                 ¦(ex-factory       ¦
   ¦   (b) for Part B          ¦  1,490,000      ¦cost) and 80%     ¦
   ¦       of the Project      ¦                 ¦of local          ¦
   ¦                           ¦                 ¦expenditures for  ¦
   ¦   (c) for Part C          ¦    210,000      ¦other items       ¦
   ¦       of the Project      ¦                 ¦procured locally  ¦
   ¦                           ¦                 ¦                  ¦
   ¦   (d) for Part D          ¦     70,000      ¦                  ¦
   ¦       of the Project      ¦                 ¦                  ¦
   ¦                           ¦                 ¦                  ¦
   ¦(2) Consultants' Services, ¦                 ¦100%              ¦
   ¦    Training and Study     ¦                 ¦                  ¦
   ¦    Tours:                 ¦                 ¦                  ¦
   ¦                           ¦                 ¦                  ¦
   ¦   (a) for Part A          ¦  1,640,000      ¦                  ¦
   ¦       of the Project      ¦                 ¦                  ¦
   ¦                           ¦                 ¦                  ¦
   ¦   (b) for Part B          ¦  4,860,000      ¦                  ¦
   ¦       of the Project      ¦                 ¦                  ¦
   ¦                           ¦                 ¦                  ¦
   ¦   (c) for Part C          ¦  2,440,000      ¦                  ¦
   ¦       of the Project      ¦                 ¦                  ¦
   ¦                           ¦                 ¦                  ¦
   ¦   (d) for Part D          ¦    220,000      ¦                  ¦
   ¦       of the Project      ¦                 ¦                  ¦
   ¦                           ¦                 ¦                  ¦
   ¦(3) Community Investment   ¦  1,710,000      ¦100%              ¦
   ¦    Grants for Part C.3    ¦                 ¦                  ¦
   ¦    of the Project         ¦                 ¦                  ¦
   ¦                           ¦                 ¦                  ¦
   ¦(4) Incremental Operating  ¦    940,000      ¦100% of local     ¦
   ¦    Expenses for Part D    ¦                 ¦expenditures      ¦
   ¦    of the Project         ¦                 ¦incurred          ¦
   ¦                           ¦                 ¦up to June 30,    ¦
   ¦                           ¦                 ¦1998, and 50% of  ¦
   ¦                           ¦                 ¦local expenditures¦
   ¦                           ¦                 ¦thereafter        ¦
   +---------------------------+-----------------+------------------+
   ¦       TOTAL               ¦ 13,800,000                         ¦
   L---------------------------+-------------------------------------
   
       2. For the purposes of this Schedule:
       (a)  the term "foreign expenditures" means expenditures in  the
   currency of any country other than that of the Recipient for  goods
   or  services supplied from the territory of any country other  than
   that of the Recipient;
       (b)  the  term "local expenditures" means expenditures  in  the
   currency  of  the Recipient or for goods or services supplied  from
   the territory of the Recipient;
       (c) the term "Community Investment Grants" means grants made to
   qualified recipients under Part C.3 of the Project; and
       (d)  the  term "Incremental Operating Expenditures"  means  the
   incremental  operating  expenditures  incurred  by  the  CPPI   for
   Project  implementation, on account of incremental staff  salaries,
   office  rental  and  utility costs, communication,  stationary  and
   copying expenses.
       3.  Notwithstanding  the provisions of paragraph  1  above,  no
   withdrawals shall be made in respect of:
       (a)  payments made for expenditures prior to the date  of  this
   Agreement;
       (b) payments made for expenditures in respect of Categories (1)
   (a)  and  (2) (a) of this Schedule, until the executive authorities
   of  at  least one subject of the Recipient affected by or  involved
   in  the  implementation of Part A of the Project shall have agreed,
   in  a  manner  satisfactory to the Bank, to implement the  relevant
   part of Part A of the Project; and
       (c) payments made for expenditures in respect of Categories (1)
   (c),  (2)  (c), and (3) of this Schedule, until: (i) the Commission
   for   Lake   Baikal   shall  have  issued  a  general   resolution,
   satisfactory to the Bank, enabling the implementation of Part C  of
   the  Project;  and  (ii) the oblast administrations  of  Chita  and
   Irkutsk  Oblasts and the Government of Buryatia have issued decrees
   or   resolutions  satisfactory  to  the  Bank,  providing  for  the
   implementation of Part C of the Project.
       4.  If  the  Bank shall have determined at any  time  that  any
   payment  made  from the Grant Account was used for any  expenditure
   not   consistent  with  the  provisions  of  this  Agreement,   the
   Recipient shall, promptly upon notice from the Bank, refund to  the
   Bank  for  deposit into the Grant Account, an amount equal  to  the
   amount so used or the portion thereof as specified by the Bank.
       5. The Bank may permit withdrawals from the Grant Account to be
   made  on  the  basis of statements of expenditure for  expenditures
   for  goods,  individual consultants' services, training  and  study
   tours,  community  investment  grants,  and  incremental  operating
   costs under contracts costing less than 50,000 USD equivalent,  and
   for  expenditures  for consultants' services under  contracts  with
   firms  costing  less  than  100,000  USD,  under  such  terms   and
   conditions as the Bank shall specify by notice to the Recipient.
   
   
   
   
   
                              SCHEDULE 2
   
                      DESCRIPTION OF THE PROJECT
   
       The  objective  of  the Project is to assist the  Recipient  to
   maintain  optimum  levels of biodiversity in  accordance  with  the
   principles   of  economic  and  environmentally  sound  sustainable
   development.
       The  Project consists of the following parts, subject  to  such
   modifications thereof as the Recipient and the Bank may agree  upon
   from time to time to achieve such objectives:
   
                                Part A
                                   
                          Strategic Overview
   
       1.  Development  of  the  national  and  regional  biodiversity
   strategies, through the provision of goods, services and training.
       2.   Strengthening   of  the  effectiveness   of   biodiversity
   strategies  through analytical and participatory  actions  designed
   to    mainstream   environmental   protection   and    biodiversity
   conservation into federal and regional development policies.
       3.  Establishment  of  a  biomonitoring information  system  to
   assist policy makers to take into account biodiversity issues.
   
                                Part B
                                   
                            Protected Areas
   
       1.  Institutional support through the strengthening of existing
   institutional  mechanisms,  improvement of  interagency  procedures
   and  coordination,  training  of  personnel,  establishment  of  an
   international  expert council on protected areas, and establishment
   of  regional associations of protected areas, through the provision
   of goods, services and training.
       2.   Improvement  of  the  administration  capacities  of   the
   Recipient's  national parks and zapovedniks to  exercise  goal  and
   project   oriented   planning,   monitoring,   implementation   and
   evaluation  of  protection initiatives, through  the  provision  of
   goods, services and training.
       3.  Support of public participation and educational programs in
   the  area  of  biodiversity through establishment of a coordinating
   center  for environmental education and public support, publication
   of  promotional materials and support of promotional programs,  and
   support for development of model ecotourism projects.
       4.  Enlargement of the profected area system to  ensure  better
   representation  of  key  areas  required  to  protect  and  promote
   globally significant biodiversity, and development of policies  and
   legislation for the protection services.
       5.   Development  of  a  comprehensive  training  program   for
   protected area staff.
   
                                Part C
                                   
                     Lake Baikal Regional Program
   
       1.  Promotion  of inter-regional biodiversity conservation  and
   natural   resource  management  strategies,  through  analysis   of
   linkages   between  economics  and  environmental  protection   and
   support  of  policy and institutional capacity building,  including
   data  analysis  and collection, and development of  uniform  legal,
   environmental,  and  economic regulatory  mechanisms,  through  the
   provision of goods, services and training.
       2.  Support  of three model regional biodiversity  conservation
   demonstration  projects  in  the areas of  the  Goloustnaya  river,
   Tunguy-Sukhara  river,  and Khilok river  watersheds,  through  the
   provision of goods, services and training.
       3.  Promotion  and  support  of local biodiversity  activities,
   through  financing  of  small grants to  local  institutions,  non-
   governmental    organizations,    communities,    businesses    and
   individuals,   through  the  provision  of  goods,   services   and
   training.
   
                                Part D
                                   
                  Project Management and Coordination
   
       Support  of  existing  and  new  structures  and  organizations
   required  for proper management and coordination of Project-related
   activities,   through  the  provision  of  funds  for   incremental
   operating expenses of the CPPI.
   
                                 * * *
   
       The Project is expected to be completed by June 30, 2001.
   
   
   
   
   
                              SCHEDULE 3
   
                 PROCUREMENT AND CONSULTANTS' SERVICES
   
                    SECTION I. PROCUREMENT OF GOODS
                                   
                                Part A
                                   
                                GENERAL
   
       Goods  shall  be procured in accordance with the provisions  of
   Section  I of the "Guidelines for Procurement under IBRD Loans  and
   IDA  Credits" published by the Bank in January 1995 and revised  in
   January 1996 (the Guidelines) and the following provisions of  this
   Section, as applicable.
   
                                Part B
                                   
                   INTERNATIONAL COMPETITIVE BIDDING
   
       1.  Except  as  otherwise provided in Part C of  this  Section,
   goods shall be procured under contracts awarded in accordance  with
   the  provisions of Section II of the Guidelines and paragraph 5  of
   Appendix 1 thereto.
       2. The following provisions shall apply to goods to be procured
   under  contracts  awarded  in accordance  with  the  provisions  of
   paragraph 1 of this Part B.
       Preference for domestically manufactured goods
       The  provisions  of paragraphs 2.54 and 2.55 of the  Guidelines
   and  Appendix  2 thereto shall apply to goods manufactured  in  the
   territory of the Recipient.
   
                                Part C
                                   
                     OTHER PROCUREMENT PROCEDURES
                                   
                       1. International Shopping
   
       Goods  estimated to cost less than 300,000 USD  equivalent  per
   contract,  up  to an aggregate amount not to exceed  3,000,000  USD
   equivalent,  may be procured under contracts awarded on  the  basis
   of   international  shopping  procedures  in  accordance  with  the
   provisions of paragraphs 3.5 and 3.6 of the Guidelines.
   
                         2. National Shopping
   
       Goods  estimated  to cost less than 50,000 USD  equivalent  per
   contract,  up  to an aggregate amount not to exceed  2,600,000  USD
   equivalent,  may be procured under contracts awarded on  the  basis
   of  national shopping procedures in accordance with the  provisions
   of paragraphs 3.5 and 3.6 of the Guidelines.
   
                                Part D
                                   
              REVIEW BY THE BANK OF PROCUREMENT DECISIONS
                                   
                        1. Procurement Planning
   
       Prior  to  the  issuance of any invitations to  prequalify  for
   bidding or to bid for contracts, the proposed procurement plan  for
   the  Project  shall  be furnished to the Bank for  its  review  and
   approval,  in  accordance with the provisions  of  paragraph  1  of
   Appendix  1 to the Guidelines. Procurement of all goods  and  works
   shall  be  undertaken in accordance with such procurement  plan  as
   shall  have  been approved by the Bank, and with the provisions  of
   said paragraph 1.
   
                            2. Prior Review
   
       With  respect to each contract for goods estimated to cost  the
   equivalent  of  100,000 USD or more, the first contract  for  goods
   procured  under international shopping and under national  shopping
   procedures,  the  procedures set forth in paragraphs  2  and  3  of
   Appendix 1 to the Guidelines shall apply.
   
                            3. Post Review
   
       With  respect to each contract not governed by paragraph  2  of
   this  Part,  the procedures set forth in paragraph 4 of Appendix  1
   to the Guidelines shall apply.
   
                 SECTION II. EMPLOYMENT OF CONSULTANTS
   
       1.  Consultants'  services  shall be procured  under  contracts
   awarded  in  accordance with the provisions of the "Guidelines  for
   the  Use  of Consultants by World Bank Borrowers and by  the  World
   Bank  as  Executing Agency" published by the Bank  in  August  1981
   (the  Consultant Guidelines). For complex, time-based  assignments,
   such contracts shall be based on the standard form of contract  for
   consultants'  services issued by the Bank, with such  modifications
   thereto  as  shall have been agreed by the Bank. Where no  relevant
   standard  contract documents have been issued by  the  Bank,  other
   standard forms acceptable to the Bank shall be used.
       2.  Notwithstanding  the  provisions of  paragraph  1  of  this
   Section,  the  provisions  of the Consultant  Guidelines  requiring
   prior  Bank  review or approval of budgets, short lists,  selection
   procedures,  letters of invitation, proposals,  evaluation  reports
   and  contracts, shall not apply to (a) contracts for the employment
   of  consulting  firms  estimated to  cost  less  than  100,000  USD
   equivalent  each or (b) contracts for the employment of  individual
   consultants  estimated  to  cost less than  50,000  USD  equivalent
   each.  However,  said  exceptions to prior Bank  review  shall  not
   apply to (a) the terms of reference for such contracts, (b) single-
   source  selection  of  consulting  firms,  (c)  assignments  of   a
   critical  nature,  as  reasonably  determined  by  the  Bank,   (d)
   amendments  to  contracts for the employment  of  consulting  firms
   raising  the contract value to 100,000 USD equivalent or above,  or
   (e)  amendments  to  contracts  for the  employment  of  individual
   consultants raising the contract value to 50,000 USD equivalent  or
   above.
   
   
   
   
   
                              SCHEDULE 4
   
                        IMPLEMENTATION PROGRAM
   
                   A. OVERALL PROJECT IMPLEMENTATION
   
       1. The SCEP shall be responsible for the overall implementation
   of  the Project and execution of the Grant. A supervisory committee
   (Supervisory Committee), to be chaired by a senior official of  the
   SCEP  (Project  Director),  shall be responsible  for  the  overall
   coordination  and  monitoring of the Project. The Project  Director
   shall  be responsible for approving policies and providing guidance
   on  critical  aspects of Project component design,  operation,  and
   review.  The  Chairman  of  the  SCEP  shall  appoint  the  Project
   Director  and other officials of the SCEP who shall be  members  of
   the  Supervisory  Committee. The head of the FFS  shall  appoint  a
   senior  official  of  the  FFS to serve  as  deputy  chair  of  the
   Supervisory Committee.
       2. The Project Director shall be supported by a project manager
   (Project  Manager),  selected and hired by the  CPPI.  The  Project
   Manager  shall be supervised by the head of the CPPI  with  respect
   to  all  administrative  matters.  The  Project  Manager  shall  be
   responsible   for  the  day-to-day  management  of   the   Project,
   including:  staff  /  consultant selection and performance;  budget
   management;   planning,   organizational   federal    /    regional
   coordination  of  the  technical  work,  scheduling   and   quality
   control; and reporting and reviewing of work in progress.
       3.  The  Project Director and Project Manager shall be assisted
   in  the  management  and supervision of the Project  by  a  general
   consultant  (General  Consultant), a  consultant  with  substantial
   experience  in the area of international biodiversity conservation,
   who  shall be hired by the CPPI. Services of a special adviser,  an
   independent    reputable   professional   specialist,    will    be
   occasionally  used by the Project Director, through the  CPPI,  for
   project activities' review and quality control.
       4.  Each part of the Project shall be supervised by a component
   director  (Component Director), who shall be a senior  official  of
   the  SCEP  and  shall  be appointed by the Chairman  of  the  SCEP.
   Component  Directors  shall report to the  Project  Director.  Each
   Component  Director,  in  consultation and  coordination  with  the
   Recipient's   Federal  Forest  Service,  when  appropriate,   shall
   provide  operational and policy guidance for his or her  respective
   component  activities and facilitate coordinated provision  of  the
   agreed-upon Recipient's contribution to the Project.
       5.  Each  Component Director shall be supported by one or  more
   component managers (Component Managers), selected and hired by  the
   CPPI.   Component   Managers  shall  report  to  their   respective
   Component  Directors  and  shall be  responsible  for  component  /
   regional  team  budgets,  work  programs  and  schedules,  staff  /
   consultant selection, and performance and progress reporting.
   
                      B. COMPONENT IMPLEMENTATION
                                   
                                Part A
                                   
                          Strategic Overview
   
       1.  The  Component  Director  of the  Part  A  of  the  Project
   (Strategic  Overview) shall be appointed by the SCEP and  shall  be
   an  official of the SCEP responsible for conservation of biological
   resources. The Component Managers shall be responsible for  day-to-
   day   management  of  activities  under  Part  A  of  the  Project.
   Activities  under  Part A of the Project shall be coordinated  with
   activities being performed under the Policy and Regulatory  Support
   Component  of  the EMP. An international scientific  and  technical
   committee,  chaired by World Conservation Union  (IUCN),  would  be
   solicited  to  provide suggestions drawn from  comparable  programs
   around the world.
   
                                Part B
                                   
                            Protected Areas
   
       2.  The  Component Director of Part B of the Project (Protected
   Areas)  shall be appointed by the SCEP and shall be an official  of
   the  SCEP  responsible for protected areas. The Component  Director
   shall   prioritize  specific  Recipient's  contributions   to   the
   Project,  including those provided for under the framework  of  the
   "Federal  Targeted Program of the State Support for  State  Natural
   Reserves  and  National  Parks for the  Period  up  to  2000".  The
   Component  Director shall be responsible for coordinating education
   and   training  activities  funded  under  the  Swiss  Grant.   The
   Component Manager shall report to the Component Director and  shall
   be  responsible  for the day-to-day management  of  the  activities
   under Part B of the Project.
   
                                Part C
                                   
                     Lake Baikal Regional Program
   
       3.  Part C of the Project (Lake Baikal Regional Program)  shall
   be  implemented  under  the direction of  a  supervisory  committee
   (Lake  Baikal  Supervisory Committee) reporting to  the  Commission
   for  Lake Baikal and to the Supervisory Committee. The Lake  Baikal
   Supervisory  Committee shall meet at least four times  a  year  and
   shall  be chaired by the executive secretary of the Commission  for
   Lake Baikal who shall also be the Component Director for Part C  of
   the  Project.  The  Lake Baikal Supervisory  Committee  shall  also
   include  a  total  of  six representatives  of  the  administrative
   bodies  of  the Republic of Buryatia and Irkutsk and Chita  Oblasts
   and  six  representatives  of the Baikal region's  non-governmental
   organization    (NGO)    community.    The    six    administrative
   representatives  shall include the Regional Subcomponent  Directors
   nominated  by  the  government  of the  Republic  of  Buryatia  and
   administrations of Irkutsk and Chita Oblasts and appointed  by  the
   SCEP.  The  heads  of  the regional bodies of  the  SCEP  or  their
   designees  in  the  Republic  of Buryatia  and  Irkutsk  and  Chita
   Oblasts  shall  be  among these six representatives.  The  six  NGO
   representatives would be nominated by the NGO community for a  one-
   year term on a rotation basis.
       4.  Each  regional subcomponent manager (Regional  Subcomponent
   Manager),  selected and hired by the CPPI, shall be  supervised  by
   the   respective  Regional  Subcomponent  Director.  The   Regional
   Subcomponent Directors and Regional Subcomponent Managers shall  be
   responsible for the regional and local activities under Part  C  of
   the  Project.  The inter-regional activities under Part  C  of  the
   Project  shall  be  supervised  and directed  by  the  Lake  Baikal
   Supervisory  Committee.  An  inter-regional  subcomponent   manager
   (Inter-regional  Subcomponent Manager), selected from  outside  the
   region  and  hired by the CPPI, shall be responsible for day-to-day
   inter-regional  activities under Part C of the Project,  and  shall
   be supervised by the Component Director of Part C of the Project.
   
                                C. CPPI
   
       1.  The CPPI shall be responsible for day-to-day administrative
   aspects  of  Project implementation. The CPPI shall be  responsible
   for  procurement, accounting, disbursement, auditing, reporting and
   monitoring, and evaluation activities under the Project.  The  CPPI
   shall  engage consultants who shall assist the CPPI in the area  of
   procurement,  financial  management and  information  systems,  and
   general  advice  and  services, Project  performance  and  progress
   evaluation.  The CPPI perform its functions under  the  Project  in
   accordance with rules and procedures established by the  SCEP,  and
   shall  liase  with the Recipient's ministries and  agencies,  other
   parties  and  sub-component implementing  teams  regarding  Project
   activities.  The CPPI shall be responsible for the  hiring  of  the
   Project  Manager, Component Managers, and other technical personnel
   responsible for Project implementation.
       2.  To fulfill its responsibilities under the Project, the CPPI
   shall  create  an  administrative unit  within  the  CPPI  (Project
   Implementation  Group).  The  Biodiversity  Project  Implementation
   Group   shall  be  headed  by  the  Project  Manager.  The   CPPI's
   accounting  and  procurement units shall  work  together  with  the
   Project  Manager on issues related to staff / consultants selection
   and  performance; consolidation of the overall project  budget  and
   financial records; management of the Project's Special Account  and
   payment  of invoices that have been approved by the Project Manager
   under  the budget; provision of procurement and logistics  services
   for   the  Project;  information  management  and  reporting;  and,
   bilateral donor program coordination.
   
   
   
   
   
                              SCHEDULE 5
   
                            SPECIAL ACCOUNT
   
       1. For the purposes of this Schedule:
       (a)  the term "eligible Categories" means Categories (1),  (2),
   (3) and (4) set forth in the table in paragraph 1 of Schedule 1  to
   this Agreement;
       (b)  the  term  "eligible expenditures" means  expenditures  in
   respect  of the reasonable cost of goods and services required  for
   the  Project  and  to be financed out of the proceeds  of  the  GET
   Grant  allocated  from time to time to the eligible  Categories  in
   accordance  with  the provisions of Schedule 1 to  this  Agreement;
   and
       (c) the term "Authorized Allocation" means an amount equivalent
   to  750,000  USD  to  be  withdrawn  from  the  Grant  Account  and
   deposited into the Special Account pursuant to paragraph 3  (a)  of
   this  Schedule,  provided,  however, that  unless  the  Bank  shall
   otherwise agree, the Authorized Allocation shall be limited  to  an
   amount  equivalent  to 500,000 USD until the  aggregate  amount  of
   withdrawals  from the Grant Account plus the total  amount  of  all
   outstanding  special commitments entered into by the Bank  pursuant
   to  Section  5.02 of the General Conditions shall be  equal  to  or
   exceed the equivalent of SDR 2,750,000.
       2.   Payments  out  of  the  Special  Account  shall  be   made
   exclusively  for  eligible  expenditures  in  accordance  with  the
   provisions of this Schedule.
       3. After the Bank has received evidence satisfactory to it that
   the  Special  Account  has  been duly opened,  withdrawals  of  the
   Authorized  Allocation and subsequent withdrawals to replenish  the
   Special Account shall be made as follows:
       (a) For withdrawals of the Authorized Allocation, the Recipient
   shall  furnish to the Bank a request or requests for  deposit  into
   the  Special  Account of an amount or amounts which do  not  exceed
   the aggregate amount of the Authorized Allocation. On the basis  of
   such  request  or  requests,  the Bank  shall,  on  behalf  of  the
   Recipient,  withdraw from the Grant Account and  deposit  into  the
   Special Account such amount or amounts as the Recipient shall  have
   requested.
       (b) (i) For replenishment of the Special Account, the Recipient
   shall  furnish to the Bank requests for deposits into  the  Special
   Account at such intervals as the Bank shall specify.
       (ii)  Prior  to  or  at  the time of  each  such  request,  the
   Recipient  shall  furnish  to  the Bank  the  documents  and  other
   evidence required pursuant to paragraph 4 of this Schedule for  the
   payment   or   payments  in  respect  of  which  replenishment   is
   requested.  On the basis of each such request, the Bank  shall,  on
   behalf  of  the  Recipient, withdraw from  the  Grant  Account  and
   deposit  into  the  Special Account such amount  as  the  Recipient
   shall  have  requested  and  as  shall  have  been  shown  by  said
   documents  and other evidence to have been paid out of the  Special
   Account  for  eligible  expenditures. All such  deposits  shall  be
   withdrawn  by the Bank from the Grant Account under the  respective
   eligible  Categories, and in the respective equivalent amounts,  as
   shall have been justified by said documents and other evidence.
       4.  For  each payment made by the Recipient out of the  Special
   Account,  the  Recipient  shall, at such time  as  the  Bank  shall
   reasonably  request, furnish to the Bank such documents  and  other
   evidence  showing  that  such  payment  was  made  exclusively  for
   eligible expenditures.
       5.  Notwithstanding  the  provisions of  paragraph  3  of  this
   Schedule,  the Bank shall not be required to make further  deposits
   into the Special Account:
       (a)  if,  at any time, the Bank shall have determined that  all
   further  withdrawals should be made by the Recipient directly  from
   the  Grant  Account in accordance with the provisions of Article  V
   of  the  General  Conditions and paragraph (a) of Section  2.02  of
   this Agreement;
       (b)  if the Recipient shall have failed to furnish to the  Bank
   within  the  period of time specified in Section 4.01 (b)  (ii)  of
   this  Agreement, any of the audit reports required to be  furnished
   to  the  Bank pursuant to said Section in respect of the  audit  of
   the records and accounts for the Special Account;
       (c) if, at any time, the Bank shall have notified the Recipient
   of  its  intention to suspend in whole or in part the right of  the
   Recipient  to make withdrawals from the Grant Account  pursuant  to
   the provisions of Section 6.02 of the General Conditions; or
       (d) once the total unwithdrawn amount of the Grant allocated to
   the eligible Categories for the Project, minus the total amount  of
   all  outstanding  special  commitments entered  into  by  the  Bank
   pursuant to Section 5.02 of the General Conditions with respect  to
   the  Project, shall equal the equivalent of twice the amount of the
   Authorized Allocation.
       Thereafter, withdrawal from the Grant Account of the  remaining
   unwithdrawn   amount  of  the  Grant  allocated  to  the   eligible
   Categories of the Project shall follow such procedures as the  Bank
   shall  specify by notice to the Recipient. Such further withdrawals
   shall  be  made  only after and to the extent that the  Bank  shall
   have  been satisfied that all such amounts remaining on deposit  in
   the  Special Account as of the date of such notice will be utilized
   in making payments for eligible expenditures.
       6.  (a) If the Bank shall have determined at any time that  any
   payment  out  of  the  Special  Account:  (i)  was  made   for   an
   expenditure  or in an amount not eligible pursuant to  paragraph  2
   of  this  Schedule;  or  (ii)  was not justified  by  the  evidence
   furnished  to the Bank, the Recipient shall, promptly  upon  notice
   from  the Bank (A) provide such additional evidence as the  Trustee
   may  request, or (B) deposit into the Special Account (or,  if  the
   Bank  shall so request, refund to the Bank) an amount equal to  the
   amount  of  such payment or the portion thereof not so eligible  or
   justified.  Unless  the  Bank  shall otherwise  agree,  no  further
   deposit  by  the Bank into the Special Account shall be made  until
   the  Recipient has provided such evidence or made such  deposit  or
   refund, as the case may be.
       (b)  If  the  Bank shall have determined at any time  that  any
   amount  outstanding in the Special Account will not be required  to
   cover  further  payments for eligible expenditures,  the  Recipient
   shall, promptly upon notice from the Bank, refund to the Bank  such
   outstanding amount.
       (c)  The Recipient may, upon notice to the Bank, refund to  the
   Bank  all  or  any portion of the funds on deposit in  the  Special
   Account.
       (d)  Refunds to the Bank made pursuant to paragraphs 6 (a), (b)
   and  (c)  of  this Schedule shall be credited to the Grant  Account
   for  subsequent  withdrawal or for cancellation in accordance  with
   the  relevant provisions of this Agreement, including  the  General
   Conditions.
   
   

Списки

Право 2010


Новости партнеров
Счетчики
 
Популярное в сети
Реклама
Курсы валют
27.06.2015
USD
54.81
EUR
61.41
CNY
8.83
JPY
0.44
GBP
86.35
TRY
20.6
PLN
14.72
Разное